As a multifaceted company we have undertaken various contracts of differing sizes and types, which can be divided into the following groups:

  • Data centre close control cooling
  • Commercial / Industrial
  • Telecommunication & Media
  • Public Sector
  • Retail


Client: Barloworld Equipment

Project
Component Rebuild Centre – Boksburg

Description
New G4 and F6 filtration and pressurisation to workshop area. This project saw Climatron design, fabricate and install a variable speed ventilation and filtration system to pressurise the new 20,000m² component rebuild centre in Isando – Boksburg.

The system consists of 14 identical units with variable speed axial flow fans and is capable of supplying 291m³/s of filtered air to pressurise the workshop and maintain a dust free component rebuilding environment. Critical planning went into the design of each system to enable easy access and maintenance.

pic here
pic here

Client: Brydens Properties

Project
Upper Greyston – Block E

Description
In this design and supply project Climatron has supplied and installed a heat recovery variable refrigeration flow system to maximise energy efficiency. The system is further fitted with an economy cycle ventilation system to reduce the HVAC energy demand on the electrical infrastructure. Climatron was responsible for compiling all related documentation for the submission to the GBCSA.

The team is currently attempting a 5 star green rated building during as built phase. The design phase already achieved a comfortable 4 star rating.

pic here
pic here

Client: DFR Engineers

Project
Hotel 224 Pretoria

Description
Design, supply and installation of a Hot Water Heat Pump System

pic here
pic here

Client: Alminic Construction

Project
New Chancery Building for Christ the King Cathedral – Doornfontein

Description
Supply and installation of a heat recovery VRF HVAC and Evaporative cooling systems.

Installation of various 4-way and 1-way cassette indoor units

pic here
pic here

 

 

Client: Amdec Property Development

Project
120 End Street Mall, New Doornfontein

Description
Supply and Installation of a Rooftop Package HVAC system to the Shoprite Store. Ventilation and Smoke Extract systems to Line Shops.

pic here
pic here

Client:

Project
Wits Arts Museum - Braamfontein

Description
Supply and installation of Closed Control HVAC system.

pic here
pic here

Client: Ruwacon Construction

Project
Barloworld Equipment - Kathu

Description
Design, supply and installation of Various R410a Refrigerant split units and extract, and evaporative coolers.

pic here
pic here

Client: Linkwood Developments

Project
Vitalab New Delivery Theatre

Description
Supply and installation of Closed Control Rooftop Package HVAC system

pic here
pic here

Client: Inner Circle

Project
TBA

Description
TBA

pic here
pic here

Effective co-ordination and communication of all trades including sub-contractors is considered fundamental to completing a successful project for our clients.